From site work and slab through to the final coat of paint — one crew, one schedule, and a project lead who picks up the phone.

(512) 844-0199

Home Construction

Building a house is mostly a scheduling problem wearing a construction hat.

The materials aren't complicated. What separates a build that finishes on time from one that drags for an extra six months is sequencing — having the plumber on site the day after the slab cures, having windows on the ground before the roof dries in, catching a framing error before the drywall covers it.

We build a small number of homes at a time on purpose. It means the person who walked your lot and drafted your budget is the same person on site during framing, and the same person who hands you the keys. Nothing gets relayed through three layers of office staff.

You'll get a written phase schedule at the start and an update every week: what got done, what's next, and anything that moved. Draws are tied to completed phases, not to the calendar, so you're never paying ahead of the work.

What's included

Everything this job actually covers

Site work & foundation

Lot prep, drainage, and an engineered slab poured to the geotech report for your specific soil.

Framing & dry-in

Framing to plan, roof, windows and doors — the phase where getting it right saves the most money later.

MEP rough-in

Plumbing, electrical and HVAC laid out for how the house will actually be lived in, then inspected before close-up.

Insulation & drywall

Spray foam or batt to spec, then drywall, texture and a level finish that holds up to Texas humidity swings.

Interior finish-out

Cabinetry, counters, tile, trim, paint and fixtures — the same finish standard as our remodel work.

Permits & inspections

Every permit pulled and every inspection scheduled and attended by us, not by you.

How it works

Four stages, start to finish

Budget & feasibility

We walk the lot, review your plans, and build an itemised budget before anyone signs anything.

Permits & schedule

Plans through the city or county, and a written phase schedule you'll be able to track against.

Build phases

Slab, frame, dry-in, rough-in, insulation, drywall, finish — each signed off before the next starts.

Walkthrough & warranty

A full punch walkthrough, documented fixes, then a warranty period with a direct line to us.

Questions

Good to know before we start

Can't find your answer? Ask us directly — we usually reply the same day.

Either. Plenty of clients arrive with an architect's set; others start with a rough idea and we bring in a draftsman. We'll tell you honestly what a set of plans will cost to build before you get attached to it.

Most of our builds run 7–12 months from slab to keys, depending on size, finish level and how quickly selections get made. Slow selections are the single most common cause of delay.

Draws are tied to completed and inspected phases — not to dates. You're never paying for work that hasn't happened.

We build on land you already own. We're happy to walk a lot you're considering and flag drainage, access or slab issues before you buy.

Also from Fox

Other things we build

Completed custom home exterior

Get Started

Ready to talk about your home construction project?

Book a free consultation and we'll walk the space, talk through scope, and put a realistic number on it. We serve Taylor, Hutto, Round Rock and Georgetown.